Chandrayaan 2: First look at the mission days before the 15 July launch at the ISRO launch center
With only a week left for the launch, all components of the mission have been integrated with the GSLV Mk-III.

[caption id="attachment_6953891" align="alignnone" width="1280"]
The L110 liquid fuel stage with two Vikas engines is being transported for integration with the GSLV Mk-III. Image credit: ISRO[/caption][caption id="attachment_6953771" align="alignnone" width="1280"]
The indigenously developed C25 Cryogenic Upper Stage of the GSLV Mk-III at the launch centre. Image credit: ISRO[/caption][caption id="attachment_6953881" align="alignnone" width="1280"]
The integration of C25 cryogenic stage to the L110 stage in progress. Image credit: ISRO[/caption][caption id="attachment_6953781" align="alignnone" width="1280"]
ISRO engineers hoist the L110 i.e. the core stage to integrate it with the two S200 solid rocket boosters. Image credit: ISRO[/caption][caption id="attachment_6953841" align="alignnone" width="1280"]
The S200 solid boosters of GSLV Mk-III M1 vehicle are being placed on the launch pedestal. These are the second largest fuel boosters in operation. Image credit: ISRO[/caption][caption id="attachment_6953861" align="alignnone" width="1280"]
One of the segments of the S200 side boosters being carried during the integration. Image credit: ISRO[/caption][caption id="attachment_6953801" align="alignnone" width="1280"]
The slanted nose cones of S200 solid side boosters are being placed on the boosters. These were modified from the GSLV to reduce the vibrations inside the rocket for future man missions. Image credit: ISRO[/caption][caption id="attachment_6953821" align="alignnone" width="1280"]
The equipment bay of the GSLV Mk-III M1, which also houses the rocket’s guidance system, in the process of integration. Image credit: ISRO[/caption][caption id="attachment_6953901" align="alignnone" width="1280"]
The L110 liquid furl stage after it has been integrated with the S200 side boosters. Image credit: ISRO[/caption][caption id="attachment_6953811" align="alignnone" width="1280"]
The Pragyan rover is being rolled into the Vikram Lander. Image credit: ISRO[/caption][caption id="attachment_6953851" align="alignnone" width="1280"]
The Orbiter, which has a mission life of one year, at the launch centre. Image credit: ISRO[/caption][caption id="attachment_6953871" align="alignnone" width="1280"]
The Vikram lander being hoisted onto the Orbiter. The payload fairing is visible in the background. Image credit: ISRO[/caption][caption id="attachment_6953831" align="alignnone" width="1280"]
The Vikram lander, mounted on top of the Orbiter, will stay there till it needs to separate and attempt a soft landing on the Moon. Image credit: ISRO[/caption][caption id="attachment_6953791" align="alignnone" width="1280"]
The partially-integrated GSLV Mk-III M1 vehicle being moved from the integration centre to the launch pedestal. Image credit: ISRO[/caption]

India seize control of Dominica Test after Ravichandran Ashwin rattles West Indies with spin brilliance
India@75: From Jawaharlal Nehru to Narendra Modi, a throwback to Independence Day at Red Fort
Tejashwi Yadav ties knot with school friend Rajshri at intimate ceremony in Delhi
Here's a sneak-peek at the redeveloped Rani Kamalapati Railway Station inaugurated by PM Modi
NASA-SpaceX capsule carrying 4 astronauts returns to Earth, ending 200-day space station mission
