Advertisement

Wall still blocks elephant corridor near Kaziranga despite SC order to bring it down

The 2.2-kilometre boundary wall was built in 2011 by a state-run fossil fuel refinery.

Advertisement
Tech2 News Staff|Mar 06, 2019, 18:55:20 IST

Despite the Supreme Court ordering a refinery in Assam to tear down a concrete wall near Kaziranga National Park in January this year, it continues to stand and block the movement of wild elephant along an important wildlife corridor in the state.The 2.2-kilometre boundary wall was built in 2011 to allow state-run fossil fuel facility, Numaligarh Refinery Limited (NRL), to expand its operations into the Deopahar Reserve.NRL was taken to court by the National Green Tribunal (NGT) in August 2018, when the NRL refused. The Tribunal's been trying to have the wall demolished since 2016.The refinery was compelled to take down a 289-metre stretch of the wall in March 2018 to free up the passage for elephants to move between Kaziranga and Deopahar, a path that the wall obstructs.In their view, demolishing the entire wall was unnecessary.[caption id="attachment_6209321" align="alignnone" width="1280"]Representational image. Representational image.[/caption]By striking down the appeal made by the NRL to maintain the wall, SC judges said that "Elephants have first right on the forest," according to LiveLaw. "Elephants do not go to office in a designated route. We cannot encroach upon the elephant’s area."After the Supreme Court order, a divisional forest officer Jayashree Naiding reportedly wrote a letter to the refinery, to which a general manager at NRL responded saying that a case regarding the area of land the wall stands on is still ongoing in the Guwahati High Court, according to a report in the Wire.But as Naiding is quoted as saying, all previous and pending appeals regarding the wall were waived as part of the SC order passed on 18 January. She added the matter was now in the district commissioner – Dhiren Hazarika's hands.[caption id="attachment_5030641" align="alignnone" width="1280"]A herd of elephants cross a road that passes through the flooded Kaziranga National Park in the northeastern state of Assam, India in July, 2017. Reuters A herd of elephants crosses a road that passes through the flooded Kaziranga National Park in the northeastern state of Assam, India in July 2017. Reuters[/caption]Hazarika also dashed off a letter to the NRL, telling them to comply with the order, and that he was still new to the place and unfamiliar with the case, according to an NE Now report.But with what little he knew, Hazarika reportedly called out NRL for concealing their stay order in the list of pending cases presented to the Supreme Court during the appeal proceedings.Now, a month after the SC order was passed, the matter has now been escalated to the local administration and Supreme Court registrar. The most recent warning to the NRL comes as the last word on the matter, "In case no action is taken urgently to demolish the said boundary wall, then the undersigned will be constrained to take legal recourse as mandated by law against the Chief Secretary [and other officers of the district administration]."

Handpicked stories, in your inbox
Global stories. Indian perspective. Zero noise.
No Spam. Unsubscribe Any Time.
First Published:Mar 06, 2019, 18:55:20 IST
Advertisement
Advertisement
Trending Stories

PM Modi announces fast-track courts for paper leak cases; CJP responds ‘Dharmendra Pradhan must go’

Amid protests demanding accountability for the leak of medical entrance test Neet and other irregularities in the education system, Prime Minister Narendra Modi has announced that the government has decided to set up fast-track courts to ensure swift and stringent punishment for those involved in paper leaks.
3 min read
Advertisement
Advertisement
Up Next