Cabinet approves Power System Development Fund
The fund will also be utilised towards installation of shunt capacitors, series compensators and other reactive energy generators for improvement of voltage profile in the grid. <br /><br />

New Delhi: The government today approved the proposal of the Ministry of Power for operationalisation of the Power System Development Fund.
"Power System Development Fund (PSDF) will be utilised for creating necessary transmission systems of strategic importance based on operational feedback by Load Dispatch Centers for relieving congestion in Inter-State Transmission Systems," Finance Minister P Chidambaram told reporters here after the cabinet meeting. 
Power funds. Reuters
The fund will also be utilised towards installation of shunt capacitors, series compensators and other reactive energy generators for improvement of voltage profile in the grid.
It will be also used for installation of standard and special protection schemes, pilot and demonstrative projects, and for setting right discrepancies identified in protection audits on regional basis.
Renovation and Modernisation (R&M) of transmission and distribution systems for relieving congestion and any other scheme or project in furtherance of the above objectives, such as, conducting technical studies and capacity building, etc.
PSDF will be operationalised within three months, he said.
PTI

India’s trade surplus with US may cross $90 billion after tariff cuts, says SBI report
Inflation likely to be a big focus area for budget 2024, say sources
Explained: Will the Bank of Japan break tradition and raise interest rates?
UK enters recession, central bank admits
Explained: How the rising US dollar can affect everyone

