ISRO successfully carries out the fourth and final orbit raising operation for its IRNSS-1I satellite
ISRO did not provide any information for how many minutes the satellites' onboard motors were fired for raising the orbit


GSLV launch. ISRO[/caption]The achieved perigee height (nearest point to the earth) is 35,462.9 km and apogee height (farthest point to the earth) is 35,737.8 km. The IRNSS-1I was launched on 12 April.After a flight lasting about 19 minutes, the Polar Satellite Launch Vehicle (PSLV) achieved a Sub Geosynchronous Transfer Orbit with a perigee of 281.5 km and an apogee of 20,730 km inclined at an angle of 19.2 degree to the equator.At that point, the IRNSS-1I got separated from the rocket. Following that ISRO carried out four orbit raising operations on 13 April (first and second), 14 April (third operation) and 15 April.However, the ISRO did not provide any information for how many minutes the satellites' onboard motors were fired for raising the orbit.

Why AI notetakers are raising serious privacy and security concerns
China's low-cost AI models are changing the global AI race. Here's why Silicon Valley is worried
China's Kimi K3 challenges US AI leaders with frontier-level performance at lower cost
How did Instagram run ads promoting child abuse in India?
Why has India halted WhatsApp’s username feature before launch?
